Northern Tracks Forum
General Forums => Trail Talk => Topic started by: Swamp Dawg on March 28, 2010, 02:44:28 pm
-
Getting our dock hauled in was high priority this year, as the old one would have presumably been washed away by this summer. One load of small dock parts and decking and 30 gallons of fuel then another load with the dock beams. Next will be a portable gas welder to weld the dock to the anchor plates.
http://i169.photobucket.com/albums/u236/mudflinger150/Our%2052/1.jpg
http://i169.photobucket.com/albums/u236/mudflinger150/Our%2052/2.jpg
http://i169.photobucket.com/albums/u236/mudflinger150/Our%2052/3.jpg
http://i169.photobucket.com/albums/u236/mudflinger150/Our%2052/6.jpg
http://i169.photobucket.com/albums/u236/mudflinger150/Our%2052/7.jpg
http://i169.photobucket.com/albums/u236/mudflinger150/Our%2052/4.jpg
http://i169.photobucket.com/albums/u236/mudflinger150/Our%2052/5.jpg